
Custom Flag MOQ and Lead Times: What a Chinese Factory Actually Quotes
MOQ 50 to 100 pieces by product, sampling 3 to 7 days, bulk production 15 to 20 days after approval. The real numbers, with packing data you need for landed cost.
SOURCING GUIDES
Specification-level guides for buyers sourcing custom flags, banners and display products — written from the production floor in Lu’an, Anhui. Fabric weights, print routes, MOQ and lead times, with the numbers we actually quote against.

MOQ 50 to 100 pieces by product, sampling 3 to 7 days, bulk production 15 to 20 days after approval. The real numbers, with packing data you need for landed cost.

Same poles, same bases, different behaviour in wind. A production-side comparison of feather and teardrop beach flags, with sizes, hardware options and MOQ.

Which polyester belongs on your custom flag? A production-side comparison of 68D, 100D, 110gsm knitted, 300D, mesh, PVC, satin and felt — with the MOQ and lead times that go with them.
THE CATALOGUE BEHIND THE GUIDES
Every guide on this page is written from the specifications we quote against. All products are quote-only.
Custom & Advertising FlagsWholesale Car FlagsCustom car window flags produced to order in 68D or 110gsm knitted polyester, supplied with a 45 cm or 50…
Custom & Advertising FlagsWholesale Garden FlagsCustom garden flags produced to order in double-layer 300D polyester, supplied as a set with a 1 m metal ground…
Custom & Advertising FlagsWholesale Hand FlagsCustom hand held flags produced to order in 100% polyester, supplied on a plastic or wooden staff. Four standard sizes…NEXT STEP
Send the product, artwork, size and quantity. We reply with fabric, print route, MOQ and lead time in writing.